WKM Consultancy Downloads
Enhanced Pipeline Risk Assessment, Part 1 , Probability of Failure Assessment – “Scoring or ranking type pipeline risk assessments have served the pipeline industry well for many years. However, risk assessments are being routinely used today in ways….�
Enhanced Pipeline Risk Assessment, Part 2, Revision 3, Assessments of Pipeline Failure Consequences – “Understanding and quantifying potential consequences from a pipeline failure is a challenging undertaking. Estimates of potential consequences must address…�
An Overview of the Risk Management Process - “By now everyone is probably familiar with the most common definition of risk: Risk = Probability x Consequences (R = P x C) …�
General Account Office Report, OPS is Changing, 2000 – “Pipelines are inherently safer to the public than other modes of freight transportation for natural gas and hazardous liquids (such as oil products) because they are …�
Georgia Strait Crossing Pipeline - Absolute Risk Assessment Presented to Canadian NEB, “This document presents preliminary estimates of risks to the public that might be created by the proponed operation of the GSX pipeline. The additional risk calculations build …�
Lessons Learned Paper - W. Kent Muhlbauer Authored Risk Management Paper, “The safety of pipelines relative to other modes of transportation is generally not in question—by most measures, moving products by pipeline is safer than by …�
Pipeline Risk Model Development Guideline – “A useful way to view this process is a direct analogy with new pipeline construction. In either case, a certain discipline is required. As with new …�
Risk Management Workshop - Clarion Pipeline Conference Workshop Information, “Risk management has been embraced by both the pipeline industry and regulatory agencies as a way to not only increase public safety but also to optimize all aspects of pipeline design, operations, and maintenance. A WKM Consultancy risk management workshop is normally designed ….� |